1. Details
- Main Struction
- Interior:
- Utilities
Communal cable, less insulated PVC piping, communal water and pressurized drainage piping, three-hole socket, switch panel/USB panel
- Baths(optional)
- Kitchen (optional)
- Appliance(optional)
Air conditioner, Electric water heater, refrigerator, washing machine with drying, 4K Projector, Floor heating, Electric curtain
- Furniture(optional)
Sofa, Bed, Coffee table, Lounge Chair
2. Delivery
Delivery:
Delivery place: factory located in Foshan, China, the nearest port of delivery is Nansha port in Guangzhou, or Shekou port in Shenzhen.
For details of delivery methods and shipping costs, you can see this blog: Delivery and Cost
*we can also support DDP(Door to Door), if you are an individual customer with no experience of importing from China, but you will need to contact our sales manager for detailes.
Delivery time:
Production: 45 days
Delivery time: 20-35 days
Therefore, we can deliver to any country in the world.
*Time may vary depending on holidays in China and the destination country and the complexity of the route to the delivery site.
3. Payment
Payment methods
T/T payment
Reviews
There are no reviews yet.